Dubin Industrial District, Hanjiang – Fujian – China, South | 13666935270 | |
http://www.china-lutong.com/ | ||
Industry > AUTOMOBILE, tires, mats, electric vehicles, patents ... |
Fujian (China, South) - Madrid (Spain) | Fujian (China, South) - Industry 4.0 (China - Africa) |
Fujian (China, South) - Shenzhen (China, Guandong) | Fujian (China, South) - Homemade (Energy ad hoc) |
Fujian (China, South) - EAC (African blocs) | Fujian (China, South) - ASEAN (Asian blocs) |
Fujian (China, South) - Singapore City (Singapore) | Fujian (China, South) - Commonwealth (Economic Blocs) |
Fujian (China, South) - Andean Community (American blocs) | Fujian (China, South) - CEFTA (European blocs) |
Fujian (China, South) - Belt and Road 4.0 (Coordinated Routes) | Fujian (China, South) - Manila (Philippines) |
Fujian (China, South) - GCC (Arabian blocs) | Fujian (China, South) - Air (Coordinated transport) |
Fujian (China, South) - Havana (Cuba) | Fujian (China, South) - Tel Aviv (Israel) |
Fujian (China, South) - New Delhi (India) | Fujian (China, South) - Bogota (Colombia) |
Fujian (China, South) - casablanca (Morocco) | Fujian (China, South) - Africa 4.0 (Continents) |
Fujian (China, South) - World 4.0 (All countries) | Fujian (China, South) - Montevideo (Uruguay) |
Fujian (China, South) - San Jose (Costa Rica) | Fujian (China, South) - Anping County (China, Bohai Bay) |
Fujian (China, South) - Miami (USA, East Coast) | Fujian (China, South) - Mexico city (Mexico) |
Buy Pump Head 2 468 336 020 distributor rotor car
Material:GCr15
Size:10-12mm
Certification:ISO9001
Color:Black
Place of Origin:China
Samples:Charge
Sample Price:Negotiation
Delivery Time:7-30days
Packing:Standard Packing Or Required
Delivery Port:Xiamen
Max. Production Capacity:15000
Export Ratio:71% - 80%
Diesel fuel is injected just before the power stroke. As a result, the fuel cannot burn completely unless it has a sufficient amount of oxygen. This can result in incomplete combustion and black smoke in the exhaust if more fuel is injected than there is air available for the combustion process. Modern engines with electronic fuel delivery can adjust the timing and amount of fuel delivered, and so operate with less waste of fuel. In a mechanical system fuel timing system, the injection and duration must be set to be efficient at the anticipated operating rpm and load, and so the settings are less than ideal when the engine is running at any other RPM. The electronic injection can measure engine revs, load, even boost and temperature, and continuously alter the timing to match the given situation. In the petrol engine, air and fuel are mixed for the entire compression stroke, ensuring complete mixing even at higher engine speeds.
China Lutong Parts Plant is a professional OEM & Aftermarket parts supplier, which specialized in Head Rotors, diesel nozzle, plunger, delivery valve, Bosch head rotor, diesel injector, pencil nozzle for all kinds of vehicles and diesel engines. We have strong technique power, advanced equipment, craft, first class processing test equipment, perfect quality assurance system and excellent after services.We are always at your disposal to provide you with high quality products, perfect service and fast delivery at competitive price.
We Have advantages :
1) 28 years produce experience with capacious warehousing
2) a competelty warranty systerm
3) competive price and good quality
4) standard packing or as required
5) Factory price
If you have any interested in our products or have any inquiry, Please don't hesitate to contact us. We will give you the best price, best quality and best service.
OEM No. Pump No. MFR Name Engine Type Remaking
BOSCH 0 000 000 068
BOSCH 1 468 333 314 0 460 403 008 VM HR 392 SHTR 3/10L
BOSCH 1 468 333 320 0 460 403 003 IVECO 8131.61.210 3/10R
BOSCH 1 468 333 321 0 460 403 013 ALFA ROMEO VM 96 A 3/10L
BOSCH 1 468 333 323 0 460 403 002 FIAT GEOTECH 8035.06.206,306 3/10L
BOSCH 1 468 334 313 0 460 494 109 FIAT/IVECO 8144.61/40-8 4/9R
BOSCH 1 468 334 319 0 460 494 046 OPEL Opel-23 D OHC 4/9L
BOSCH 1 468 334 326 0 460 494 055 RENAULT J8S 4/9R
BOSCH 1 468 334 327 0 460 494 084 VW CR,JK 4/9R
BOSCH 1 468 334 330 0 460 494 044 FIAT 138 A. 4/9R
BOSCH 1 468 334 331 0 460 494 193 FIAT 146 B 3.00 4/9R
BOSCH 1 468 334 336 0 460 484 013
4/8R
BOSCH 1 468 334 337 0 460 404 005 FORD York/VE-Pumpe 4/10R
BOSCH 1 468 334 347 0 460 404 008 PEUGEOT 147 4/10R
BOSCH 1 468 334 348 0 460 404 042 ROVER VM-81A 4/10L
BOSCH 1 468 334 366 0 460 494 105 RENAULT F8M 730 4/9R
BOSCH 1 468 334 367 0 460 404 025
4/10R
BOSCH 1 468 334 372 0 460 494 079 PEUGEOT 155 4/9R
BOSCH 1 468 334 377 0 460 404 064 FIAT 8144.91 S 4/10R
BOSCH 1 468 334 378 0 460 424 066 CDC 4BT-3.9 4/12R
BOSCH 1 468 334 379 0 460 494 122 FORD LTA 4/9R
BOSCH 1 468 334 380 0 460 494 121 PEUGEOT 152A 4/9R
BOSCH 1 468 334 383 0 460 494 132 FIAT M 705 BA 190 4/9R
BOSCH 1 468 334 388 0 460 484 016 CITROEN K96Y 4/8R
BOSCH 1 468 334 389 0 460 494 144 LANCIA 831 D.. 4/9L
BOSCH 1 468 334 391 0 460 404 036 OPEL 23 TD 4/10L
BOSCH 1 468 334 412 0 460 494 071 VAUXHALL 16 D OHC 4/9L
OT GAO
Activity: China-Lutong Parts Plant
China-Lutong Parts Plant